Which is better to control the electric quick installation ball valve? In our daily life, the construction of a city depends on whether the water supply system and drainage system are in place, but the water supply pipelines need to be reinforced with double flange pipe electric ball valves, However, many customers did not notice some points in the use of the electric ball valve for the double flange pipeline, which affected the service life of this section of pipeline. So here is a brief introduction to the precautions in the use of the electric ball valve for the double flange pipeline.
1. The model, specification and pipeline configuration of the electric ball valve for double flange pipeline shall be checked before installation, which must meet the design requirements.
2. For the double flange pipe electric ball valve with inner sleeve, attention shall be paid to make the direction of the inner sleeve cylinder consistent with the flow direction of the medium, and the hinge rotation plane of the hinged double flange pipe electric ball valve shall be consistent with the displacement rotation plane.
3. For the double flange pipeline electric ball valve that needs to be "cold tightened", the auxiliary components used for pre deformation shall not be removed until the pipeline is installed.
4. It is strictly prohibited to adjust the installation out of tolerance of the pipeline by deformation of the electric ball valve of the corrugated double flange pipeline, so as not to affect the normal function of the electric ball valve of the double flange pipeline, reduce the service life and increase the load of the pipeline system, equipment and supporting members.
5. During installation, welding slag is not allowed to splash on the surface of the corrugated shell, and the corrugated shell is not allowed to suffer from other mechanical damage.
6. After the installation of the pipeline system, the yellow auxiliary positioning components and fasteners used for installation and transportation on the electric ball valve of corrugated double flange pipeline shall be removed as soon as possible, and the limit device shall be adjusted to the specified position according to the design requirements, so that the pipeline system has sufficient compensation capacity under environmental conditions.
7. All moving elements of the double flange pipeline electric ball valve shall not be blocked or restricted by external components, and the normal action of all moving parts shall be ensured.
8. During the hydrostatic test, the secondary fixed pipe support installed at the end of the electric ball valve pipeline of double flange pipeline shall be reinforced to prevent the pipeline from moving or rotating. For pneumatic valves and their connecting pipelines used for gas medium, attention shall be paid to whether temporary supports are required during water filling. The 96 chloride ion content of cleaning solution for water pressure test shall not exceed 25PPM.
9. After the hydrostatic test, the accumulated water in the wave case shall be drained as soon as possible and the inner surface of the wave case shall be blown dry. 10. The insulation material in contact with the corrugated pipe of double flange pipe electric ball valve shall be free of chloride ion. In conclusion, we should pay attention to the above precautions during the use of the double flange pipeline electric ball valve. I suggest that after the installation of the double flange pipeline electric ball valve, we should pay more attention to the above precautions before use, so as to make full use of the double flange pipeline electric ball valve.