Table of Specifications and Models of Wafer Pneumatic Ball Valve Is Port 2 Open or Closed? Precautions for cooling water tower operation
1. Keep the water tower clean and conduct water treatment regularly.
2. After about 60h of operation, the belt tension must be rechecked to ensure that it is normal.
3. The oil level of the gear reducer and the lubricating oil must be replaced after 150h of operation.